Case Study
GSK Avoids Batch Loss with Aspen Process Pulse™ and Aspen Unscrambler™
GSK, a leading multinational pharmaceutical and biotechnology company, consistently seeks innovative solutions to develop new vaccines and specialty medicines efficiently and with top quality. In pursuit of this goal, they sought a solution to address pH variability in bioreactors, aiming to mitigate risks to product batches and reduce process drift and equipment failures.
Case Study
How Iberdrola Uses DERMS to Assess Flexibility on a Renewables-Heavy Grid
The Iberdrola Group is driving Spain toward a future powered by 100% renewables. In 2007, Iberdrola made clean energy adoption the central pillar in its corporate strategy. Starting with large investments in wind energy, the company has since evolved to develop and deploy utility-scale solar, energy storage, smart grids and digital technologies.
Case Study
Specialty Chemicals Producer Reduces Off-Spec Product With Aspen ProMV®
A leading global producer of catalyst solutions and specialty chemicals faced a significant challenge as a result of light impurities causing product quality issues in its downstream production units. By implementing Aspen ProMV, the company witnessed a rapid time to value, with analysis and modeling completed in a fraction of the time required by competing solutions.
Case Study
Brazilian Pulp Producer Improves Planning, Decision-Making with Industrial AI
Discover how Eldorado Brasil, a leading pulp producer, revolutionized their production processes with industrial AI. Seeking to optimize efficiency, reduce waste and minimize resource consumption, Eldorado used Aspen Hybrid Models, combining the power of AI with Aspen Plus® first principles modeling.
Page 1 of 18