Case Study

Data-Driven Maintenance Planning Saves $1.8 Million USD Per Year in Shutdown Costs

A global provider of knowledge-based maintenance, modifications and asset integrity services wanted to take a more data-driven approach to planned maintenance and reduce unplanned downtime to optimize lifecycle costs.

Case Study

Global Energy Company Improves Safety and Asset Integrity with Machine Learning

In this case study learn how a global oil and gas company was able to detect and predict a variety of pending equipment failures. Download today to uncover how Aspen Mtell enabled the company to correctly identify all reported events – as well as unknown problems.

Case Study

Two Looming Failures Stopped Within Two Weeks of Monitoring

Executives at this mining company were looking for a new approach to proactively handle reliability issues for critical equipment.

Case Study

Optimización de la producción en transporte e instalaciones de producción de gas natural con una solución integral de ingeniería

Aprenda cómo YPFB Andina aumentó su producción de gas utilizando una solución de modelo integrado que proporcionó un aumento en las ganancias por $ 280 millones en 1 año.

Case Study

Mine Moves from Calendar-based to Prescriptive Maintenance with Aspen Mtell

When one of the world’s largest fully integrated zinc and lead smelting and refining complexes wanted to improve their metallurgical operations, the company turned to Aspen Mtell® prescriptive maintenance.

Case Study

Global Engineering Organization Improves Bids and Estimates with Aspen Capital Cost Estimator

Linde Engineering North America monitors construction costs and progress using ACCE linked to 3D models driving down the cost of the estimate.

Case Study

Linde Engineering Efficiency Across Project Lifecycle

Linde Engineering reduced estimating variability from 60% to 15% by adopting ACCE. They reduced their total number of estimating tools from 25 to 6.  They have integrated ACCE with 3D modeling to track project costs through detailed design and construction effectively.

Case Study

PEMEX Out-Performs Industry Benchmarks for Major Capital Projects Estimating

Learn how PEMEX achieved less than 15% estimating variance over a five-year period with 30 major refining projects.

Case Study

Production Optimization of Natural Gas Pipelines & Field Production Facilities Using Performance Engineering

Learn how YPFB Andina was able to increase their gas production using an integrated model solution that was able to provide a $280M increase in revenue in 1 year.

Case Study

Digital Transformation with Predictive Maintenance Drives Cost Savings

When this large energy company launched its digital transformation initiative, it turned to Aspen Mtell® to execute an online predictive maintenance pilot on a hydrogen compressor.

Page 6 of 245