Case Study

Increasing Capacity in Sulfur Production Using Sulsim Modeling

Siirtec Nigi increased their sulfur production from 50 to 90 tons per day using Aspen HYSYS Sulsim to simulate the case study and conduct a sensitivity analysis around their oxygen enrichment. The new process required minimal equipment changes and no additional downtime other than turnaround.

Case Study

LG Chem Significantly Increases Plant Capacity and Reduces Energy Usage

LG Chem increases capacity by 15% and saves energy through heat integration using Aspen Plus®, Aspen Energy Analyzer, and Aspen Exchanger Design and Rating

Case Study

Reliance Industries Ltd Troubleshoots with Aspen Plus and Saves $2.4M USD per Year

Reliance, an Indian conglomerate, built an Aspen Plus model in-house for a distillation column revamp with Aspen Plus which resulted in increased production by $2.4M/year. Learn how they saved money by building the simulations themselves and coming up with a cost-effective solution.

Case Study

Process Ecology Saves up to $60K/Day by Reducing Emissions and Avoiding Shutdowns at Gas Dehydration Facilities

Learn how Process Ecology, a Calgary-based oil and gas consultancy that assists gas processing plants in the operation of their facilities, used Aspen HYSYS to model and provide operating strategies to minimize air emissions, optimize use of solvents and eliminate permit violations.

Case Study

PEMEX Out-Performs Industry Benchmarks for Major Capital Projects Estimating

Learn how PEMEX achieved less than 15% estimating variance over a five-year period with 30 major refining projects.

Case Study

Data-Driven Maintenance Planning Saves $1.8 Million USD Per Year in Shutdown Costs

A global provider of knowledge-based maintenance, modifications and asset integrity services wanted to take a more data-driven approach to planned maintenance and reduce unplanned downtime to optimize lifecycle costs.

Case Study

Fluor Achieves Significant Time Savings in SRU Simulation

Learn how Fluor created a digital twin of their entire sulfur recovery unit, including recycle streams, in a single file using Aspen HYSYS® with Sulsim. Read this case study to find out how AspenTech’s solution for SRU optimization allows users to increase production, reduce OPEX and meet emissions regulations by modeling the complexities of the SRU and the full gas plant.

Case Study

Multivariate Statistical Analysis Finds the Bad Actors in Light Component Losses

This petrochemical company launched an Aspen ProMV™ pilot project to investigate light component losses that go to the bottom of a fractionation column and pressurize the downstream column. Using Aspen ProMV for continuous processes, a model was developed, and bad actors that are highly correlated to the light product loss were identified. Aspen ProMV’s optimization tool was also utilized to provide better operating conditions to reduce losses.

Case Study

European Refinery Tackles Heat Exchange Issues and Saves Millions in the Process

Learn how a European refinery saved $4M per year by implementing an automated fouling monitoring application utilizing Aspen HYSYS, Aspen EDR and MS Excel.

Case Study

European Refinery Tackles Heat Exchange Issues and Saves Millions in the Process

Learn how a European refinery saved $4 MM per year by implementing an automated fouling monitoring application utilizing Aspen HYSYS, Aspen EDR and MS Excel.

Page 1 of 3