Case Study

Transforming Sales and Operations Planning at Criterion

Learn why Criterion Catalysts uses Aspen Plant Scheduler to ensure they are able to fulfill their sales demands while alerting them of inventory problems. The solution is a critical part of their monthly Sales and Operations Planning (S&OP) process, and provides them with global supply chain and inventory visibility 12 months out in the future.

Case Study

Reliance Industries Ltd Troubleshoots with Aspen Plus and Saves $2.4M USD per Year

Reliance, an Indian conglomerate, built an Aspen Plus model in-house for a distillation column revamp with Aspen Plus which resulted in increased production by $2.4M/year. Learn how they saved money by building the simulations themselves and coming up with a cost-effective solution.

Case Study

Hitachi Zosen Case Study

ACM is extremely powerful in reducing engineering time by up to 30% for new and novel processes.

Case Study

Westlake Chemical Improves Reaction Time from Hours to Minutes

Learn how Westlake assesses time sensitive supply chain opportunities, such as accepting a modified customer order, in a matter of minutes using Aspen Plant Scheduler rather than four hours using previous spreadsheet methods.

Case Study

Dow Chemical Eliminates Raw Material Management Errors for Two Years Running

Global specialty chemicals producer turns to aspenONE® Production Management and Execution (PM&E) to implement procedural control, efficiently moving raw materials and avoiding process upsets.

Case Study

Infineum Increases Production by 2,000 Tons per Year with Global Information Management System

Learn why this world-class specialty chemical producer turned to manufacturing execution systems (MES) solutions from AspenTech to improve manufacturing efficiency and increase annual production.

Case Study

Owens Corning Standardizes on Aspen Plant Scheduler and Receives Rapid Deployment Results

Find out how Owens Corning went live concurrently across 14 manufacturing locations with Aspen Plant Scheduler in less than 12 weeks, and enabled schedulers to make decisions that were impossible to make just a few years earlier.

Case Study

Global Engineering Organization Improves Bids and Estimates with Aspen Capital Cost Estimator

Linde Engineering North America monitors construction costs and progress using ACCE linked to 3D models driving down the cost of the estimate.

Case Study

Cabot Improves Quality by 30% and Reduces Variability with Global Manufacturing Execution System

Cabot standardized on Aspen InfoPlus.21 across all manufacturing sites, improving product quality by 30% and reducing product variability by 20%.

Case Study

Cabot Streamlines and Standardizes Scheduling, Greatly Improving Visibility

Learn how specialty chemical manufacturer’s Carbon Black business implements Aspen Plant Scheduler at more than 20 plants worldwide to close the gap between planning and execution.