Case Study

Cabot Improves Quality by 30% and Reduces Variability with Global Manufacturing Execution System

Cabot standardized on Aspen InfoPlus.21 across all manufacturing sites, improving product quality by 30% and reducing product variability by 20%.

Case Study

Dairy Producer Glanbia Increases OEE and Throughput with Real-Time Performance Management

Glanbia Food Ingredients implements AspenTech MES solutions to increase annual savings and boost product yield while reducing energy consumption.

Case Study

Leaks in Reboiler Detected With Months of Advance Notice

Learn how a manufacturer of engineering thermoplastics discovered the root cause of recurring failures in their shell-and-tube reboilers using Aspen Mtell prescriptive maintenance.

Case Study

Aspen ProMV™ Saves Petrochemical Company Over $1 Million USD in Losses to Flare

A large petrochemical company was seeing incremental loss to flare of more than $1M USD annually. Read how Aspen ProMV was able resolve their issue within 2 days, save $1M per year and prevent future losses.

Case Study

How Braskem Idesa Increased Reactor Uptime by Over 20% Using Existing Data and Resources

In this case study, learn how Braskem Idesa used Aspen ProMV™ to proactively identify and correct for conditions that historically led to high reactor fouling.

Case Study

Como a Braskem Idesa Aumentou o Tempo Operativo do Reator em mais de 20% Usando Datos e Recursos Existentes

Neste estudo de caso, saiba como a Braskem Idesa usou o Aspen ProMV™ para identificar e corregir em forma proativa condições que históricamente levaram ao entumpimento dos reatores altos.

Case Study

Cómo Braskem Idesa incrementó su tiempo útil en más de 20% utilizando datos y recursos existentes

En este caso de estudio, conozca cómo Braskem Idesa utilizó Aspen ProMV ™ para identificar y corregir de manera proactiva y de acuerdo a las condiciones históricas que llevaron a una mayor velocidad de ensuciamiento.

Case Study

Leading Refiner Reduces Planning Run Times from Hours to Minutes and Finds Profitable Solutions

Learn how this world leader in refining reduced planning runtime from 30 hours to 90 minutes, making the process 95% faster and allowing them to respond to market changes much faster.

Case Study

Hitachi Zosen Case Study

ACM is extremely powerful in reducing engineering time by up to 30% for new and novel processes.

Case Study

Multivariate Statistical Analysis Finds the Bad Actors in Light Component Losses

This petrochemical company launched an Aspen ProMV™ pilot project to investigate light component losses that go to the bottom of a fractionation column and pressurize the downstream column. Using Aspen ProMV for continuous processes, a model was developed, and bad actors that are highly correlated to the light product loss were identified. Aspen ProMV’s optimization tool was also utilized to provide better operating conditions to reduce losses.

Page 1 of 4