Case Study

Perstorp Develops KPI Production Portal to Focus Organization on Meeting Plant Production Targets

Large Specialty Chemical Company develops advanced KPI production partial portal tool using Aspen InfoPlus.21 tools, building upon their extensive Aspen InfoPlus.21 installation.

Case Study

Global Engineering Organization Improves Bids and Estimates with Aspen Capital Cost Estimator

Linde Engineering North America monitors construction costs and progress using ACCE linked to 3D models driving down the cost of the estimate.

Case Study

Global Refinery Deploys Cost Estimation Solution to Accelerate Decision Making and Lower Costs

Phillips66 improves estimating productivity by 85% and reduces estimating variability to +/-15% with a five year before and after analysis of estimates vs. completed projects. Download the case study to learn more.

Case Study

PEMEX Out-Performs Industry Benchmarks for Major Capital Projects Estimating

Learn how PEMEX achieved less than 15% estimating variance over a five-year period with 30 major refining projects.

Case Study

Infineum Increases Production by 2,000 Tons per Year with Global Information Management System

Learn why this world-class specialty chemical producer turned to manufacturing execution systems (MES) solutions from AspenTech to improve manufacturing efficiency and increase annual production.

Case Study

Owens Corning Standardizes on Aspen Plant Scheduler and Receives Rapid Deployment Results

Find out how Owens Corning went live concurrently across 14 manufacturing locations with Aspen Plant Scheduler in less than 12 weeks, and enabled schedulers to make decisions that were impossible to make just a few years earlier.

Case Study

Mid-Size EPC Reduces Cost Estimating Time Up to 90% to Meet Tighter Schedules and Budgets

Learn how S&B reduces estimating man-hours by between 50-80% depending on project stage through use of ACCE on all bids and estimates.

Case Study

Next Generation of APC Delivers Benefits for Ethylene Manufacturer

Learn how Qenos, an Austrailian ethylene manufacturer, used Aspen DMC3 to revamp a demethaniser controller with very limited resources and achieved a 5-10% increase in cold end throughput, a 40% reduction in variability in overhead methane, and a 20% reduction in tower dP.

Case Study

Westlake Chemical Improves Reaction Time from Hours to Minutes

Learn how Westlake assesses time sensitive supply chain opportunities, such as accepting a modified customer order, in a matter of minutes using Aspen Plant Scheduler rather than four hours using previous spreadsheet methods.

Case Study

Strategic Estimating Systems (SES)

Learn how SES, one of the leading estimating organizations worldwide, saves 70% manhours using ACCE. SES is responsible for, estimating projects such as SADARA, Suncor Tar Sands, and Mozambique LNG using ACCE.

Page 5 of 162