Case Study

Reliance Industries Ltd Troubleshoots with Aspen Plus and Saves $2.4M USD per Year

Reliance, an Indian conglomerate, built an Aspen Plus model in-house for a distillation column revamp with Aspen Plus which resulted in increased production by $2.4M/year. Learn how they saved money by building the simulations themselves and coming up with a cost-effective solution.

Case Study

Experienced Engineering Services Provider Achieves Enhanced Productivity in Natural Gas Processing Plant Design

Read how experienced engineering service provider, Bilfinger, has been able to design entire gas processing projects, including new innovations such as acid gas cleaning and relief valve sizing, all within the comprehensive Aspen HYSYS engineering environment, faster and with optimal process selections.

Case Study

HGA Boosts Ability to Efficiently Complete Relief Sizing with aspenONE Engineering

The PSV sizing capabilities in Aspen HYSYS have helped HGA achieve approximately 50% time savings on the entire overpressure protection workflow.

Case Study

Mid-Size EPC Reduces Cost Estimating Time Up to 90% to Meet Tighter Schedules and Budgets

Learn how S&B reduces estimating man-hours by between 50-80% depending on project stage through use of ACCE on all bids and estimates.

Case Study

Global Engineering Organization Improves Bids and Estimates with Aspen Capital Cost Estimator

Linde Engineering North America monitors construction costs and progress using ACCE linked to 3D models driving down the cost of the estimate.

Case Study

PEMEX Out-Performs Industry Benchmarks for Major Capital Projects Estimating

Learn how PEMEX achieved less than 15% estimating variance over a five-year period with 30 major refining projects.

Case Study

Korea's SK E&C Reduces Engineering Estimating Man-Hours by 50% With Aspen Capital Cost Estimator™

Learn how SK Engineering & Construction improved the speed and accuracy of their capital project cost estimates with Aspen Capital Cost Estimator (ACCE).

Case Study

Increasing Capacity in Sulfur Production Using Sulsim Modeling

Siirtec Nigi increased their sulfur production from 50 to 90 tons per day using Aspen HYSYS Sulsim to simulate the case study and conduct a sensitivity analysis around their oxygen enrichment. The new process required minimal equipment changes and no additional downtime other than turnaround.

Case Study

Multivariate Statistical Analysis Finds the Bad Actors in Light Component Losses

This petrochemical company launched an Aspen ProMV™ pilot project to investigate light component losses that go to the bottom of a fractionation column and pressurize the downstream column. Using Aspen ProMV for continuous processes, a model was developed, and bad actors that are highly correlated to the light product loss were identified. Aspen ProMV’s optimization tool was also utilized to provide better operating conditions to reduce losses.

Case Study

LG Chem Significantly Increases Plant Capacity and Reduces Energy Usage

LG Chem increases capacity by 15% and saves energy through heat integration using Aspen Plus®, Aspen Energy Analyzer, and Aspen Exchanger Design and Rating

Page 1 of 3