Case Study

Hitachi Zosen Case Study

ACM is extremely powerful in reducing engineering time by up to 30% for new and novel processes.

Case Study

PEMEX Out-Performs Industry Benchmarks for Major Capital Projects Estimating

Learn how PEMEX achieved less than 15% estimating variance over a five-year period with 30 major refining projects.

Case Study

LG Chem Significantly Increases Plant Capacity and Reduces Energy Usage

LG Chem increases capacity by 15% and saves energy through heat integration using Aspen Plus®, Aspen Energy Analyzer, and Aspen Exchanger Design and Rating

Case Study

Global Engineering Organization Improves Bids and Estimates with Aspen Capital Cost Estimator

Linde Engineering North America monitors construction costs and progress using ACCE linked to 3D models driving down the cost of the estimate.

Case Study

Mid-Size EPC Reduces Cost Estimating Time Up to 90% to Meet Tighter Schedules and Budgets

Learn how S&B reduces estimating man-hours by between 50-80% depending on project stage through use of ACCE on all bids and estimates.

Case Study

Linde Engineering Efficiency Across Project Lifecycle

Linde Engineering reduced estimating variability from 60% to 15% by adopting ACCE. They reduced their total number of estimating tools from 25 to 6.  They have integrated ACCE with 3D modeling to track project costs through detailed design and construction effectively.

Case Study

Graham Hart

Graham Hart achieves 97% on time delivery of complex heat exchangers through use of HYSYS and Aspen EDR.

Case Study

Strategic Estimating Systems (SES)

Learn how SES, one of the leading estimating organizations worldwide, saves 70% manhours using ACCE. SES is responsible for, estimating projects such as SADARA, Suncor Tar Sands, and Mozambique LNG using ACCE.

Case Study

Experienced Engineering Services Provider Achieves Enhanced Productivity in Natural Gas Processing Plant Design

Read how experienced engineering service provider, Bilfinger, has been able to design entire gas processing projects, including new innovations such as acid gas cleaning and relief valve sizing, all within the comprehensive Aspen HYSYS engineering environment, faster and with optimal process selections.

Case Study

Process Ecology Saves up to $60K/Day by Reducing Emissions and Avoiding Shutdowns at Gas Dehydration Facilities

Learn how Process Ecology, a Calgary-based oil and gas consultancy that assists gas processing plants in the operation of their facilities, used Aspen HYSYS to model and provide operating strategies to minimize air emissions, optimize use of solvents and eliminate permit violations.

Page 1 of 3