Case Study

European Refinery Tackles Heat Exchange Issues and Saves Millions in the Process

Learn how a European refinery saved $4M per year by implementing an automated fouling monitoring application utilizing Aspen HYSYS, Aspen EDR and MS Excel.

Case Study

HGA Boosts Ability to Efficiently Complete Relief Sizing with aspenONE Engineering

The PSV sizing capabilities in Aspen HYSYS have helped HGA achieve approximately 50% time savings on the entire overpressure protection workflow.

Case Study

Data-Driven Maintenance Planning Saves $1.8 Million USD Per Year in Shutdown Costs

For service providers, project execution is critical to customer confidence and overall success. Download this case study to learn how a global provider of knowledge-based maintenance, modifications and asset integrity services saved $1.8 million in shutdown costs using Aspen Mtell.

Case Study

Multivariate Statistical Analysis Finds the Bad Actors in Light Component Losses

This petrochemical company launched an Aspen ProMV™ pilot project to investigate light component losses that go to the bottom of a fractionation column and pressurize the downstream column. Using Aspen ProMV for continuous processes, a model was developed, and bad actors that are highly correlated to the light product loss were identified. Aspen ProMV’s optimization tool was also utilized to provide better operating conditions to reduce losses.

Case Study

Global Engineering Organization Improves Bids and Estimates with Aspen Capital Cost Estimator

Linde Engineering North America monitors construction costs and progress using ACCE linked to 3D models driving down the cost of the estimate.

Case Study

Mid-Size EPC Reduces Cost Estimating Time Up to 90% to Meet Tighter Schedules and Budgets

Learn how S&B reduces estimating man-hours by between 50-80% depending on project stage through use of ACCE on all bids and estimates.

Case Study

Graham Hart

Graham Hart achieves 97% on time delivery of complex heat exchangers through use of HYSYS and Aspen EDR.

Case Study

Linde Engineering Efficiency Across Project Lifecycle

Linde Engineering reduced estimating variability from 60% to 15% by adopting ACCE. They reduced their total number of estimating tools from 25 to 6.  They have integrated ACCE with 3D modeling to track project costs through detailed design and construction effectively.

Case Study

S&B Engineers Case Study

Learn how S&B reduces estimating manhours by between 50-80% depending on project stage through use of ACCE on all bids and estimates.

Case Study

Strategic Estimating Systems (SES)

Learn how SES, one of the leading estimating organizations worldwide, saves 70% manhours using ACCE. SES is responsible for, estimating projects such as SADARA, Suncor Tar Sands, and Mozambique LNG using ACCE.