Case Study

Experienced Engineering Services Provider Achieves Enhanced Productivity in Natural Gas Processing Plant Design

Read how experienced engineering service provider, Bilfinger, has been able to design entire gas processing projects, including new innovations such as acid gas cleaning and relief valve sizing, all within the comprehensive Aspen HYSYS engineering environment, faster and with optimal process selections.

Case Study

HGA Boosts Ability to Efficiently Complete Relief Sizing with aspenONE Engineering

The PSV sizing capabilities in Aspen HYSYS have helped HGA achieve approximately 50% time savings on the entire overpressure protection workflow.

Case Study

Reliance Industries Ltd Troubleshoots with Aspen Plus and Saves $2.4M USD per Year

Reliance, an Indian conglomerate, built an Aspen Plus model in-house for a distillation column revamp with Aspen Plus which resulted in increased production by $2.4M/year. Learn how they saved money by building the simulations themselves and coming up with a cost-effective solution.

Case Study

Case Study: European Engineering Company Saves $400,000 USD on CAPEX Using aspenONE® Engineering

Discover how PETROLTERV saved significant CAPEX on a revamp project via greater design accuracy offered by the integrated aspenONE Engineering suite of products. In addition, after using the suite, PETROLTERV no longer has to outsource a large number of engineering projects, such as air cooler design, pressure safety valve sizing, etc. Completing more work in-house has enabled them to bring down their project costs, as well as deliver those projects on time and on budget.

Case Study

Graham Hart

Graham Hart achieves 97% on time delivery of complex heat exchangers through use of HYSYS and Aspen EDR.

Case Study

Global Engineering Organization Improves Bids and Estimates with Aspen Capital Cost Estimator

Linde Engineering North America monitors construction costs and progress using ACCE linked to 3D models driving down the cost of the estimate.

Case Study

PEMEX Out-Performs Industry Benchmarks for Major Capital Projects Estimating

Learn how PEMEX achieved less than 15% estimating variance over a five-year period with 30 major refining projects.

Case Study

Fluor Achieves Significant Time Savings in SRU Simulation

Fluor uses Aspen HYSYS to evaluate different configurations of oxygen enrichment in the reactor model, with empirical correlations built in for more accurate modeling. AspenTech’s solution for SRU optimization allows users to increase production, reduce OPEX and meet emissions regulations by modeling the complexities of the SRU and the full gas plant.

Case Study

S&B Engineers Case Study

Learn how S&B reduces estimating manhours by between 50-80% depending on project stage through use of ACCE on all bids and estimates.

Case Study

LG Chem Significantly Increases Plant Capacity and Reduces Energy Usage

LG Chem increases capacity by 15% and saves energy through heat integration using Aspen Plus®, Aspen Energy Analyzer, and Aspen Exchanger Design and Rating

Page 1 of 3