Sitecore Version 10.4 - Refreshed
Case Study

LG Chem Significantly Increases Plant Capacity and Reduces Energy Usage

LG Chem increases capacity by 15% and saves energy through heat integration using Aspen Plus®, Aspen Energy Analyzer™ and Aspen Exchanger Design and Rating™.

Case Study

Novozymes Uses Process Modeling to Optimize and Develop Biodiesel Processes

Novozymes A/S, a global biotechnology company based in Denmark, was looking to support the development and optimization of biodiesel processes due to increasing biodiesel market demand, rising materials costs and more stringent industry regulations.

Case Study

Researchers Develop More Efficient Oleochemical Fractionation with AspenTech® Performance Engineering

This case study details the work done at the Universiti Malaysia Pahang to research oleochemical fractionation to how to make the process more sustainable, reducing process carbon footprint. The case study explores the AspenTech solutions implemented as well as the value created.

Case Study

Aspen ProMV™ Saves Petrochemical Company Over $1 Million USD in Losses to Flare

A large petrochemical company was seeing incremental loss to flare of more than $1M USD annually. Read how Aspen ProMV was able resolve their issue within 2 days, save $1M per year and prevent future losses.

Case Study

Multivariate Statistical Analysis Finds the Bad Actors in Light Component Losses

This petrochemical company launched an Aspen ProMV™ pilot project to investigate light component losses that go to the bottom of a fractionation column and pressurize the downstream column. Using Aspen ProMV for continuous processes, a model was developed, and bad actors that are highly correlated to the light product loss were identified. Aspen ProMV’s optimization tool was also utilized to provide better operating conditions to reduce losses.

Case Study

Reliance Industries Ltd Troubleshoots with Aspen Plus and Saves $2.4M USD per Year

Reliance, an Indian conglomerate, built an Aspen Plus model in-house for a distillation column revamp with Aspen Plus which resulted in increased production by $2.4M/year. Learn how they saved money by building the simulations themselves and coming up with a cost-effective solution.

Page 1 of 1