Case Study

Aspen ProMV™ Saves Petrochemical Company Over $1 Million USD in Losses to Flare

A large petrochemical company was seeing incremental loss to flare of more than $1M USD annually. Read how Aspen ProMV was able resolve their issue within 2 days, save $1M per year and prevent future losses.

Case Study

Energy Company Drives Innovation in Predictive Maintenance via Digital Transformation Program

When developing its highly successful digital transformation program, a leading European energy company turned to Aspen Mtell® for predictive maintenance. After deploying Aspen Mtell on more than 50 large assets in a refinery, the company began testing the technology at a wind farm and had five early successes in predicting gear box failures.

Case Study

How Braskem Idesa Increased Reactor Uptime by Over 20% Using Existing Data and Resources

In this case study, learn how Braskem Idesa used Aspen ProMV™ to proactively identify and correct for conditions that historically led to high reactor fouling.

Case Study

Empresa Global de Papel e Celulose melhora Produção e Reduz Custos de Manutenção

Uma empresa global de papel e celulose se propôs a prever riscos e aumentar capacidade usando o poder da automação.

Case Study

Global Pulp and Paper Company Improves Production, Cuts Maintenance Costs

A global pulp and paper manufacturer set out to predict risk and improve capacity using the power of automation.

Case Study

Como a Braskem Idesa Aumentou o Tempo Operativo do Reator em mais de 20% Usando Datos e Recursos Existentes

Neste estudo de caso, saiba como a Braskem Idesa usou o Aspen ProMV™ para identificar e corregir em forma proativa condições que históricamente levaram ao entumpimento dos reatores altos.

Case Study

Cómo Braskem Idesa incrementó su tiempo útil en más de 20% utilizando datos y recursos existentes

En este caso de estudio, conozca cómo Braskem Idesa utilizó Aspen ProMV ™ para identificar y corregir de manera proactiva y de acuerdo a las condiciones históricas que llevaron a una mayor velocidad de ensuciamiento.

Case Study

Multivariate Statistical Analysis Finds the Bad Actors in Light Component Losses

This petrochemical company launched an Aspen ProMV™ pilot project to investigate light component losses that go to the bottom of a fractionation column and pressurize the downstream column. Using Aspen ProMV for continuous processes, a model was developed, and bad actors that are highly correlated to the light product loss were identified. Aspen ProMV’s optimization tool was also utilized to provide better operating conditions to reduce losses.

Case Study

Global Energy Company Improves Safety and Asset Integrity with Machine Learning

In this case study learn how a global oil and gas company was able to detect and predict a variety of pending equipment failures. Download today to uncover how Aspen Mtell enabled the company to correctly identify all reported events – as well as unknown problems.

Case Study

Refinery Gets Asset Failure Predictions with Nearly a Month of Lead Time

Because traditional diagnostic methods weren’t preventing equipment failures or identifying root causes of historic failures, a U.S. refinery turned to Aspen Mtell prescriptive maintenance to improve internal data science resources. Download this case study to learn how this refinery's pilot program with Aspen Mtell was able to predict failures with nearly one month of lead time, enabling planning for maintenance and rescheduling production.

Page 1 of 2