Case Study

イノベーションファストトラック:新製品開発における時間と コストの節約 (日本語事例カタログ)

ケノス社がAspen Plus®バッチモデリングを活用し、プロセスにおいてどのように利益を確保し、試運転、試作をほとんど行わず、顧客ニーズの変更に対応できたかをご説明しています。日本語の事例カタログです。

Case Study

혁신을 위한 패스트 트랙: 신제품 개발 시간 및 비용 절감

Qenos 사가 Aspen Plus®의 회분식 모델링을 어떻게 자사의 공정에 적용하여 변화하는 고객의 요구에 맞춰 플랜트 검증 단계를 최소화하고, 고객 맞춤형 제품을 신속하게 시장에 공급할 수 있었는지 실제 사례를 소개합니다.

Case Study

Lubrizol社Aspen Plus®活用事例 プロセス開発時間の短縮

Lubrizol社がどのようにAspen Plus を活用し、包括的にプロセス開発を行い、短期市場投入を実現しているか事例をご紹介します。

Case Study

Maturus Optimi Gets Out of the Gate Fast

Learn how Maturus Optimi leveraged the aspenONE Engineering Desktop to manage business risk in a small company through affordable, scalable access to software. Maturus Optimi helped clients achieve better capital estimates during the feasibility study and early conceptual designs solved difficult process problems with access to a complete suite of best-in-class modeling tools.

Case Study

The Innovation Fast Track: Saving Time and Money in New Product Development

Learn how Qenos uses Aspen Plus® batch modeling to gain valuable insight into their processes, allowing them to respond to changing customer requirements with fewer plant trials and experiments.

Case Study

创新快车道:节约新产品开发的时间和成本

了解凯诺斯公司如何借助Aspen Plus®间歇模拟,获得关于流程的宝贵见解,从而减少工厂试验和实验,保证流程响应不断变化的客户需求。

Case Study

Oxiteno Plant Operations Reacts Quickly to Market Demand

Oxiteno has used the aspenONE® Engineering suite extensively over the past 25 years to modify and optimize current units, as well as design new units with complex configurations. Learn more.

Case Study

Liquid Light Achieves Process Simplification and Reduces Costs

In order to meet their design need of maintaining a 25% cost advantage over conventional chemical processes, the engineers at Liquid Light needed a flexible software solution to find key property data (even for non-ideal and electrolyte systems), conduct “what-if” and case analyses, model reaction systems, select solvents, and scale-up quickly and reliably. Leveraging Aspen Plus and Aspen Properties, the members of Liquid Light have been able to make meaningful predictions about system behavior, moving them closer to full scale production.

Case Study

LG Chem Significantly Increases Plant Capacity and Reduces Energy Usage

LG Chem increases capacity by 15% and saves energy through heat integration using Aspen Plus®, Aspen Energy Analyzer, and Aspen Exchanger Design and Rating

Case Study

Reliance Industries Ltd Troubleshoots with Aspen Plus and Saves $2.4M USD per Year

Reliance, an Indian conglomerate, built an Aspen Plus model in-house for a distillation column revamp with Aspen Plus which resulted in increased production by $2.4M/year. Learn how they saved money by building the simulations themselves and coming up with a cost-effective solution.

Page 1 of 2