Case Study

Cabot Improves Quality by 30% and Reduces Variability with Global Manufacturing Execution System

Cabot standardized on Aspen InfoPlus.21 across all manufacturing sites, improving product quality by 30% and reducing product variability by 20%.

Case Study

Experienced Engineering Services Provider Achieves Enhanced Productivity in Natural Gas Processing Plant Design

Read how experienced engineering service provider, Bilfinger, has been able to design entire gas processing projects, including new innovations such as acid gas cleaning and relief valve sizing, all within the comprehensive Aspen HYSYS engineering environment, faster and with optimal process selections.

Case Study

Aspen Mtell® Machine Learning Finds Cause of Compressor Failures at LNG Facility

Read how this LNG facility used Aspen Mtell prescriptive maintenance to provide up to 61 days advance notice of catastrophic compressor failures, preventing an economic loss of more than $40M USD per occurrence. Quick to implement and readily scalable, the solution provided key insights into the root cause of the failures.

Case Study

Ahorre costos con mantenimiento predictivo durante la transformación digital

Lea cómo Aspen Mtell predijo una falla en el compresor con 35 días de anticipación, permitiendo que la empresa de energía evitara una parada de emergencia y cumpliera con las metas de producción. Minimizó las pérdidas de producción planificando la parada de la planta: ahorro potencial de 30 millones de dólares

Case Study

How Braskem Idesa Increased Reactor Uptime by Over 20% Using Existing Data and Resources

In this case study, learn how Braskem Idesa used Aspen ProMV™ to proactively identify and correct for conditions that historically led to high reactor fouling.

Case Study

Como a Braskem Idesa Aumentou o Tempo Operativo do Reator em mais de 20% Usando Datos e Recursos Existentes

Neste estudo de caso, saiba como a Braskem Idesa usou o Aspen ProMV™ para identificar e corregir em forma proativa condições que históricamente levaram ao entumpimento dos reatores altos.

Case Study

Cómo Braskem Idesa incrementó su tiempo útil en más de 20% utilizando datos y recursos existentes

En este caso de estudio, conozca cómo Braskem Idesa utilizó Aspen ProMV ™ para identificar y corregir de manera proactiva y de acuerdo a las condiciones históricas que llevaron a una mayor velocidad de ensuciamiento.

Case Study

Fluor Achieves Significant Time Savings in SRU Simulation

Learn how Fluor created a digital twin of their entire sulfur recovery unit, including recycle streams, in a single file using Aspen HYSYS® with Sulsim. Read this case study to find out how AspenTech’s solution for SRU optimization allows users to increase production, reduce OPEX and meet emissions regulations by modeling the complexities of the SRU and the full gas plant.

Case Study

Reliance Industries Ltd Troubleshoots with Aspen Plus and Saves $2.4M USD per Year

Reliance, an Indian conglomerate, built an Aspen Plus model in-house for a distillation column revamp with Aspen Plus which resulted in increased production by $2.4M/year. Learn how they saved money by building the simulations themselves and coming up with a cost-effective solution.

Case Study

Petrofac Improves Process Design Accuracy by Debottlenecking Gas Processes Increasing Capacity by 20%

Download this case study to learn how Petrofac used Aspen HYSYS with Activated EDR models to optimize heat exchanger selection and configuration for a gas production client. This solution achieved the client's goal by increasing gas field production 20%, and as a bonus, reduced CAPEX 25%.

Page 1 of 3