Improve Your CDU Operations With Aspen HYSYS® Equation Oriented Modeling
Use the equation oriented (EO) solver in Aspen HYSYS to simulate your refinery’s CDU operations. EO solves process simulations of units with complicated nested recycle loops and heat integration in less time.
What’s New in aspenONE Process Explorer?
With the KPI Hierarchies feature in aspenONE Process Explorer V10, obtain real-time perspectives of severe alarms over an entire site, and trace through the hierarchy to determine the source of alarms.
Gas Plant Optimization: Enhanced Accuracy in Aspen HYSYS
In Aspen HYSYS V10, experience added amine solvents, expanded glycol dehydration options, and new unit operations in the SRU. Empower decision making with the improved accuracy.
Introducing Staggered Analysis with BLOWDOWN Technology in Aspen HYSYS
Built on BLOWDOWN Technology in Aspen HYSYS, Staggered Analysis is a breakthrough technology for completing the design or validation of disposal systems that sequence the discharge of multiple blowdown valves.
Planning is Personal: Introducing Unified PIMS
Aspen Unified PIMS, the next generation of PIMS available with V10, was designed to make your life easier, train new users faster, and lower cost of ownership up to 30% with server deployment.
The next model maximises assets
Unlock Critical Clues to Maximize Profitability in Refineries
Big Data for the oil and gas industry
Optimising midstream with an integrated simulation environment
Maximizing refinery profit margins through process engineering