White Paper

Streamlining Projects with a Modular Approach

This article published in Business Standard [India], by Sunil Patel and Ron Beck, describes how E&Cs can gain a competitive advantage, achieving lower design costs (CAPEX) for clients through modular design; and using aspenONE engineering for design templates.

White Paper

Make Your Estimate a True Strategic Weapon

Adoption of ACCE can easily follow a known process that leverages organizational alignment, implementation of the software and a change in workflow processes that maximizes benefits.

White Paper

数字孪生与智能企业

在全球范围内,各领先组织正在接纳并实施先进的数字化技术。数字化转型之旅将改变资产密集型行业(尤其是能源和化工企业)的性质。在这种情况下,数字孪生(实物资产及其操作行为的虚拟副本)将发挥关键作用。对于今天我们创建的数字孪生,一个关键概念是人工智能在提供虚拟数据相关见解和建议方面的作用。

White Paper

Modular Design for Lower CAPEX

Achieve savings in both engineering hours and CAPEX with modular design through the use of stanadardized designs in re-useable templates.

White Paper

Right Details at the Right Time

When delivering an estimate on time and on budget, learn why it is important to focus on the components that matter most.

White Paper

Keep Projects on Track: Improve Communication During Estimating

ACCE is central to your strategy to lower CAPEX for your bids or estimates by being one common bidding and estimating platform across the bidding cycle.

White Paper

Make Your Estimate a True Strategic Weapon

Adoption of ACCE can easily follow a known process that leverages organizational alignment, implementation of the software and a change in workflow processes that maximizes benefits.

White Paper

The Engineer Inside the System: Accurate Economic Evaluation Across the Capital Project Lifecycle

Ron Beck speaks to the power of a model based estimating system providing insight to its attributes like reusable templates and saleable features. How does ACCE differ from my proprietary Excel-based spreadsheets?

White Paper

Tailoring Your Competitive Advantage - Calibrate Aspen Capital Cost Estimator to Fit Your Business

Understand the full capabilities of ACCE. Calibration will improve bid accuracy by adjusting costs to those mimicing the users. For those that have just started using ACCE or those that want to do Class 3 estimates for both Owner Operator and E&C.

White Paper

Enabling Better Project Outcomes: Six Tips for Faster, More Accurate Cost Estimates

Six tips are offered that speak to the strengths of ACCE: Eliminated manual tasks, automates repeated tasks, handles change management, leverages historical content and starts the estimating process leveraging conceptual engineering.

Page 1 of 2