Case Study

Shell Accelerates Planning, Improves Margins with Aspen PIMS-AO in the Cloud

Shell’s Manufacturing Margin Optimization team uses AspenTech solutions to optimize its energy and petrochemicals business, including planning and scheduling applications. In a highly collaborative global project with AspenTech, Shell successfully deployed Aspen PIMS-AO in the Cloud resulting in margin uplift, improved work-life balance and reduced IT costs. Read this case study to learn how you can improve margins with Aspen PIMS-AO in the Cloud.

Case Study

Borealis Achieves Faster Run Times and Better Quality Planning Solutions with Aspen PIMS-AO

Learn how Borealis, a leading provider of innovative solutions in the fields of polyolefins, base chemicals and fertilizers, implemented Aspen PIMS-AO to support the optimization team and bring about better decision-making for more profitable results. This case study also explores how Borealis achieved dramatically faster run time, employed nonlinear modeling, and deployed planning models to a centralized, virtual environment.

Case Study

Leading Refiner Reduces Planning Run Times from Hours to Minutes and Finds Profitable Solutions

Learn how this world leader in refining reduced planning runtime from 30 hours to 90 minutes, making the process 95% faster and allowing them to respond to market changes much faster.

Case Study

Next Generation of APC Delivers Benefits for Ethylene Manufacturer

Learn how Qenos, an Austrailian ethylene manufacturer, used Aspen DMC3 to revamp a demethaniser controller with very limited resources and achieved a 5-10% increase in cold end throughput, a 40% reduction in variability in overhead methane, and a 20% reduction in tower dP.

Case Study

Case Study: Prescriptive Maintenance Software Helps Saras Improve Business Performance and Drive Operational Excellence

As part of an effort to drive reliability in its refinery operations, Saras turned to Aspen Mtell prescriptive maintenance to improve equipment uptime and decrease maintenance costs. Learn how Saras executed a project within weeks that predicted equipment failures up to 45 days in advance using prescriptive analytics, and enabled the company to increase revenue and cut operating expenses.

Case Study

PETRONAS Refinery Unlocks $8.5 Million USD Per Year in Profit with Scheduling Automation Solution

See how Aspen Petroleum Scheduler and Aspen Refinery Multi-Blend Optimizer™ work together to help solve a refinery scheduling problem to realize a $0.10/bbl USD improvement in crude processed.

Case Study

UK Refinery Increases Middle Distillate Production with Aspen GDOT™

Download this case study to learn how a refinery in the UK used Aspen GDOT to increase middle distillate production by 10%. The closed loop optimization technology, adjusts multiple process units in real-time to maintain product consistency and improve overall refinery performance. Discover how you can drive more profitable operations with Aspen GDOT.

Case Study

Refinery Optimizes Middle Distillate System in Real Time with Aspen GDOT™

Learn how one of world’s largest multinational energy companies used Aspen GDOT to maximize production of specific diesel and jet fuel products at one of its refineries. By using real-time optimization across multiple APC units, the refinery was able to decrease sulfur giveaway by 70%. Download this case study to learn how you can optimize production and reduce product giveaway.

Page 1 of 1