Case Study

S&B Engineers Case Study

Learn how S&B reduces estimating manhours by between 50-80% depending on project stage through use of ACCE on all bids and estimates.

Case Study

PEMEX Out-Performs Industry Benchmarks for Major Capital Projects Estimating

Learn how PEMEX achieved less than 15% estimating variance over a five-year period with 30 major refining projects.

Case Study

Mid-Size EPC Reduces Cost Estimating Time Up to 90% to Meet Tighter Schedules and Budgets

Learn how S&B reduces estimating man-hours by between 50-80% depending on project stage through use of ACCE on all bids and estimates.

Case Study

Linde Engineering Efficiency Across Project Lifecycle

Linde Engineering reduced estimating variability from 60% to 15% by adopting ACCE. They reduced their total number of estimating tools from 25 to 6.  They have integrated ACCE with 3D modeling to track project costs through detailed design and construction effectively.

Case Study

Reliance Industries Ltd Troubleshoots with Aspen Plus and Saves $2.4M USD per Year

Reliance, an Indian conglomerate, built an Aspen Plus model in-house for a distillation column revamp with Aspen Plus which resulted in increased production by $2.4M/year. Learn how they saved money by building the simulations themselves and coming up with a cost-effective solution.

Case Study

Strategic Estimating Systems (SES)

Learn how SES, one of the leading estimating organizations worldwide, saves 70% manhours using ACCE. SES is responsible for, estimating projects such as SADARA, Suncor Tar Sands, and Mozambique LNG using ACCE.

Case Study

Global Engineering Organization Improves Bids and Estimates with Aspen Capital Cost Estimator

Linde Engineering North America monitors construction costs and progress using ACCE linked to 3D models driving down the cost of the estimate.

Case Study

Graham Hart

Graham Hart achieves 97% on time delivery of complex heat exchangers through use of HYSYS and Aspen EDR.

Case Study

Process Ecology Saves up to $60K/Day by Reducing Emissions and Avoiding Shutdowns at Gas Dehydration Facilities

Learn how Process Ecology, a Calgary-based oil and gas consultancy that assists gas processing plants in the operation of their facilities, used Aspen HYSYS to model and provide operating strategies to minimize air emissions, optimize use of solvents and eliminate permit violations.

Case Study

Maturus Optimi Gets Out of the Gate Fast

Learn how Maturus Optimi leveraged the aspenONE Engineering Desktop to manage business risk in a small company through affordable, scalable access to software. Maturus Optimi helped clients achieve better capital estimates during the feasibility study and early conceptual designs solved difficult process problems with access to a complete suite of best-in-class modeling tools.

Page 1 of 2