Case Study

Mine Moves from Calendar-based to Prescriptive Maintenance with Aspen Mtell

Download this case study to learn how one of the world’s largest fully integrated zinc and lead smelting and refining complexes wanted to improve their metallurgical operations. Seeking to make more use of the data they had in hand as well as the utility of interfaces, the company conducted a pilot of Aspen Mtell to evaluate the effectiveness of prescriptive maintenance.

Case Study

Two Looming Failures Stopped Within Two Weeks of Monitoring

Read how this mining company used Aspen Mtell® to predict two failures when deployed on 12 assets during a short online pilot—enabling them to proactively plan for the maintenance and repairs, without exposure to higher downtime costs.

Page 1 of 1