The result was significantly reduced near surface uncertainty, helping to avoid major surprises that could lead to unexpected overruns in project cost. Integrating all available data in a 3D model eliminated the need to acquire costly extra geotechnical ground penetration data, saving 25-50% of the subsurface analysis cost.