Case Study

Marathon Petroleum Corporation Upgrades Refineries to Full Refinery Scheduling with Aspen Petroleum Scheduler™

Discover how Marathon Petroleum Corporation (MPC) used Aspen Petroleum Scheduler (APS) to develop a single cradle-to-grave barrel tracking system. Once MPC started using APS, they could provide operations with better targets on unit rates and reduce the number of operational changes that were made by 70%. This allowed the process units to spend more time on a stable operation.

Case Study

혁신을 위한 패스트 트랙: 신제품 개발 시간 및 비용 절감

Qenos 사가 Aspen Plus®의 회분식 모델링을 어떻게 자사의 공정에 적용하여 변화하는 고객의 요구에 맞춰 플랜트 검증 단계를 최소화하고, 고객 맞춤형 제품을 신속하게 시장에 공급할 수 있었는지 실제 사례를 소개합니다.

Case Study

イノベーションファストトラック:新製品開発における時間と コストの節約 (日本語事例カタログ)

ケノス社がAspen Plus®バッチモデリングを活用し、プロセスにおいてどのように利益を確保し、試運転、試作をほとんど行わず、顧客ニーズの変更に対応できたかをご説明しています。日本語の事例カタログです。

On-Demand Webinar

On Demand Webinar: Beyond Digitalization-The Path to Increased Reliability and Automation in the Oil Field

Upstream organizations are increasingly leveraging data analytics, machine learning and other advanced modeling approaches to drive automation, productivity and a lower break-even price of production. However, leadership has struggled to understand where to make investments in data enablement. Join AspenTech’s Ron Beck, Industry Marketing Director and Anum Qassam, Senior Product Manager, to gain clear insight into how upstream companies can turn data into dollars.

Press Release

JXTG Nippon Oil & Energy Selects AspenTech’s aspenONE® Petroleum Supply Chain Software to Increase Refinery Profitability

JXTG Nippon Oil and Energy Selects AspenTechs aspenONE Petroleum Supply Chain Software

Press Release

Latest aspenONE® Version 10.1 Software Release Introduces Aspen Operator Training

Latest aspenONE Version 10-1 Software Release Introduces Aspen Operator Training

White Paper

Benchmarking Organizations During Lean Times

How do contractors and owners manage risk in today’s environment? There is intense pressure to understand estimating uncertainty and deliver better designs and lower bids. By reading this white paper you'll understand new ways to deliver bids faster and increase transparency with respect to estimate risk and uncertainty.

On-Demand Webinar

Discover How Chevron Saved Significant CAPEX on a Staggered Blowdown Project

Learn how Chevron confidently kept their platform’s flare loadings under capacity limits using a staggered BDV opening sequence to eliminate the need for an estimated $30M USD in flare system CAPEX.

White Paper

White Paper: Beyond Oil Digitalization-The Roadmap to Upstream Profitability

This paper discusses digital transformation in the oil patch. It explores how upstream industry leaders are capitalizing on the explosion of data and how, in particular, merging rigorous process models with both analytics and data visualization can help achieve a competitive advantage. It also reveals how innovations from AspenTech are helping to lead the way toward asset reliability and profitability.

Press Release

BP Partners with AspenTech to Improve Operations through Technology

advanced optimization, refinery planning software, optimal planning, petroleum supply chain, crude evaluation, integrated planning and scheduling

Page 234 of 348