Case Study

Production Optimization of Natural Gas Pipelines & Field Production Facilities Using Performance Engineering

Learn how YPFB Andina was able to increase their gas production using an integrated model solution that was able to provide a $280M increase in revenue in 1 year.

Case Study

Energy Company Saves $6M USD with a Performance Engineering Digital Twin

Find out how a major Energy Company in South America uses Aspen Exchanger Design & Rating™ and Aspen HYSYS® to model to simulate the reboiler circuit and regenerating column. The Digital Twin model revealed hydraulic instability in the thermosiphon system and allowed the customer to save $6M USD per year, prevent damage to the column and related equipment and much more.

Case Study

Controle el desempeño de columnas con un Digital Twin de planta usando Aspen HYSYS®

Conozca cómo Tupras utilizó el análisis de columnas en Aspen HYSYS en conjunto con Aspen Exchanger Design & Rating para incrementar en un 40% la capacidad de columna y al mismo tiempo cumplir con las especificaciones de calidad del producto.

Case Study

Control Column Performance Using Aspen HYSYS®

Learn how Tupras used the column analysis capability in Aspen HYSYS and its integration with Aspen Exchanger Design & Rating to significantly increase the column capacity and meet the required product specifications.

Blog

Making Secure Technology Choices in the Energy Industry

To remain competitive, energy companies increasingly look to artificial intelligence and machine learning to boost their advantage. But AI is everywhere now and everybody knows about its potential... so how do you create a real competitive advantage?

White Paper

サプライチェーンとオペレーション実行の連携:化学企業が利益拡大を図るための定石

最近のGartnerの調査によると、製造業の回答者の85%が、スマート製造戦略に関連する最大の課題は他のサプライチェーン機能との統合であると報告しています。 本ホワイトペーパーでは、業界のリーダーがバリューチェーン全体を調整し、顧客中心、収益性、需要と供給の変化への対応を強化した事例をご紹介しております。

Case Study

Westlake Chemical Improves Reaction Time from Hours to Minutes

Learn how Westlake assesses time sensitive supply chain opportunities, such as accepting a modified customer order, in a matter of minutes using Aspen Plant Scheduler rather than four hours using previous spreadsheet methods.

Case Study

Korea's SK E&C Reduces Engineering Estimating Man-Hours by 50% With Aspen Capital Cost Estimator™

Learn how SK Engineering & Construction improved the speed and accuracy of their capital project cost estimates with Aspen Capital Cost Estimator (ACCE).

Case Study

Saudi Aramco Increases Refinery Capacity by 100,000 Barrels/Day Using Plant Digital Twin

Learn how Saudi Aramco used Aspen HYSYS to analyze feasibility of refinery reconfiguration plans by developing plant digital twins of multiple units. The new reconfiguration plan projects a 100,000 barrels/day increase in the refinery’s processing capacity, a substantial reduction in fuel oil production together with a significant boost in diesel production capacity.

Case Study

Refinery Gets Asset Failure Predictions with Nearly a Month of Lead Time

Because traditional diagnostic methods weren’t preventing equipment failures or identifying root causes of historic failures, a U.S. refinery turned to Aspen Mtell prescriptive maintenance to improve internal data science resources. Download this case study to learn how this refinery's pilot program with Aspen Mtell was able to predict failures with nearly one month of lead time, enabling planning for maintenance and rescheduling production.

Page 169 of 347