Case Study
Linde Engineering Efficiency Across Project Lifecycle
Linde Engineering reduced estimating variability from 60% to 15% by adopting ACCE. They reduced their total number of estimating tools from 25 to 6. They have integrated ACCE with 3D modeling to track project costs through detailed design and construction effectively.
Case Study
Transforming Sales and Operations Planning at Criterion
Learn why Criterion Catalysts uses Aspen Plant Scheduler to ensure they are able to fulfill their sales demands while alerting them of inventory problems. The solution is a critical part of their monthly Sales and Operations Planning (S&OP) process, and provides them with global supply chain and inventory visibility 12 months out in the future.
Case Study
Hitachi Zosen Reduces Cost of Innovative Ethanol Dehydration System By 18% with Aspen Custom Modeler®
Hitachi Zosen Corporation is an EPC that designs and constructs waste treatment plants, industrial plants and machinery and equipment for industrial and construction purposes. Not only is it important for Hitachi Zosen Corporation to be on the forefront of innovative products that are useful to society and technology, but they also want to ensure each product allows clients to retain a competitive edge with traditional products and other emerging technologies.
White Paper
Make Your Estimate a True Strategic Weapon
Adoption of ACCE can easily follow a known process that leverages organizational alignment, implementation of the software and a change in workflow processes that maximizes benefits.
Aspen Simulation Workbook
AspenTech's Simulation Workbook offers powerful process modeling integrated with Microsoft Excel to provide process insights and smooth plant operations.
Aspen Polymers
Aspen Polymers process simulation technology helps you optimize production rates, yield and quality by modeling polymerization processes.
Page 282 of 323