AspenTech Strategic Planning for Sustainability Pathways

Develop a long term decarbonization strategy that optimizes the balance between financial objectives and net zero goals.

Award

AspenTech Wins Award for Innovative AI Product

AspenTech Strategic Planning for Sustainability Pathways™ announced as one of 2025's AI breakthroughs.

Environmental Social and Governance Report

We are committed to operating in the most responsible way possible — and enabling our customers to do the same.

Case Study

Case Study with Borouge: Maximizing Feed Utilization and Yields by Dynamically Optimizing Olefins Production

A leading petrochemical company with one of the world’s largest, most sophisticated integrated petrochemical complexes, Borouge was looking to gain greater visibility over processes to accommodate feed fluctuations and better coordinate operating conditions across multiple units.

Sustainability

Meet rising resource demands & sustain our planet. AspenTech's decarbonization & optimization software empowers businesses for a sustainable future.

Blog

Reducing Risk and Cost of Renewable Energy and Improving Emissions Reduction Results

Aspen Utilities Planner provides valuable insight into real-time operation and supply changes.

Blog

Ever Wondered How to Efficiently Manage Energy Usage?

Cultivation of digital technologies is one of the promising solutions to meet the growing energy demand while managing net zero targets.

Article

Utilize a Process Simulation Digital Twin to Optimize Condensate Yield

To drive its condensate maximization initiative, ADNOC is using AspenTech® solutions to develop a process simulation digital twin using a hybrid model.

Blog

Digital Production Scheduling is a High ROI for Chemicals Manufacturers

Insights learned from three customers who increased site production throughput by 20%+

On-Demand Webinar

Implementing Aspen Unified Planning and Scheduling Featuring Shell

Shell recently completed a pilot evaluation of Aspen Unified Planning™ (AUP) and Aspen Unified Scheduling™ (AUS) at the Pernis and Moerdijk manufacturing complexes. The objective of the project was to simplify and streamline the deployment of newer software versions to enhance the efficiency and usability of its planning and scheduling tools.

Page 303 of 331