Brochure

Aspen Plant Scheduler

Generate optimal production schedules to maximize profitability and meet service levels with the Aspen Plant Scheduler Family.

Case Study

Linde Engineering Efficiency Across Project Lifecycle

Linde Engineering reduced estimating variability from 60% to 15% by adopting ACCE. They reduced their total number of estimating tools from 25 to 6.  They have integrated ACCE with 3D modeling to track project costs through detailed design and construction effectively.

Case Study

Cabot Streamlines and Standardizes Scheduling, Greatly Improving Visibility

Learn how specialty chemical manufacturer’s Carbon Black business implements Aspen Plant Scheduler at more than 20 plants worldwide to close the gap between planning and execution.

Case Study

Transforming Sales and Operations Planning at Criterion

Learn why Criterion Catalysts uses Aspen Plant Scheduler to ensure they are able to fulfill their sales demands while alerting them of inventory problems. The solution is a critical part of their monthly Sales and Operations Planning (S&OP) process, and provides them with global supply chain and inventory visibility 12 months out in the future.

Case Study

Hitachi Zosen Reduces Cost of Innovative Ethanol Dehydration System By 18% with Aspen Custom Modeler®

Hitachi Zosen Corporation is an EPC that designs and constructs waste treatment plants, industrial plants and machinery and equipment for industrial and construction purposes. Not only is it important for Hitachi Zosen Corporation to be on the forefront of innovative products that are useful to society and technology, but they also want to ensure each product allows clients to retain a competitive edge with traditional products and other emerging technologies.

White Paper

The Engineer Inside the System: Accurate Economic Evaluation Across the Capital Project Lifecycle

Ron Beck speaks to the power of a model based estimating system providing insight to its attributes like reusable templates and saleable features. How does ACCE differ from my proprietary Excel-based spreadsheets?

White Paper

Make Your Estimate a True Strategic Weapon

Adoption of ACCE can easily follow a known process that leverages organizational alignment, implementation of the software and a change in workflow processes that maximizes benefits.

White Paper

Enabling Better Project Outcomes: Six Tips for Faster, More Accurate Cost Estimates

Six tips are offered that speak to the strengths of ACCE: Eliminated manual tasks, automates repeated tasks, handles change management, leverages historical content and starts the estimating process leveraging conceptual engineering.

Professional Services

Accelerate time to value by leveraging comprehensive on-site and remote services to deploy industry-leading technologies faster and more efficiently than ever before.

Press Release

Aspen Technology Helps Leading Energy Transmission Company in Latin America Deliver 99.99 Percent Power Reliability to Customers

Interconexión Eléctrica S.A. E.S.P. Relies on AspenTech’s Digital Grid Management Solutions to Manage Expansive Network Across Three Countries

Page 288 of 328