Sitecore Version 10.4 - Refreshed
Case Study

Tekfen Engineering Adopts Concurrent Engineering to Accelerate Carbon Capture FEED Proposals

As sustainability initiatives like carbon capture move to the forefront, engineering teams are being asked to deliver FEED proposals faster—without sacrificing accuracy, scenario evaluation or early cost visibility.

Case Study

Korea's SK E&C Reduces Engineering Estimating Man-Hours by 50% With Aspen Capital Cost Estimator™

Learn how SK Engineering & Construction improved the speed and accuracy of their capital project cost estimates with Aspen Capital Cost Estimator (ACCE).

Case Study

PEMEX agiliza la ejecución de proyectos con diseño optimizado y estimación de costo

Descubra por qué PEMEX eligió una solución de aspenONE para ayudarlo a construir un Centro de Excelencia para impulsar el rendimiento operativo.

Case Study

Customer Testimonial: PEMEX Accelerates Project Execution with Optimized Design and Cost Estimation

Learn why PEMEX chose an aspenONE solution to help build a Center of Excellence to drive operational performance.

Page 1 of 1