Case Study

Multivariate Statistical Analysis Finds the Bad Actors in Out-of-Spec Batches

Learn how a large producer of synthetic rubber used Aspen ProMV to identify the cause of ongoing quality issues with its batch products. Download the case study to read how Aspen ProMV uncovered the variables that correlated most with batch quality, resolving production problems faster to limit losses.

Case Study

Multivariate Statistical Analysis Finds the Bad Actors in Light Component Losses

This petrochemical company launched an Aspen ProMV™ pilot project to investigate light component losses that go to the bottom of a fractionation column and pressurize the downstream column. Using Aspen ProMV for continuous processes, a model was developed, and bad actors that are highly correlated to the light product loss were identified. Aspen ProMV’s optimization tool was also utilized to provide better operating conditions to reduce losses.

Case Study

Multivariate Statistical Analysis Finds Cause of Quench Oil High-Viscosity Issue

One of the world's largest chemical, plastic and refining companies used Aspen ProMV to understand and resolve production problems caused by an ongoing quench oil high-viscosity issue. In this case study, learn how Aspen ProMV enabled the company to highlight the top process variables highly correlated with viscosity issues, and quickly guided process engineers to the underlying issue to limit losses.

Case Study

Petrochemical Production Facility Drives Value and Maximizes Return with Non-linear APC

Non-linear Advanced Process Control (APC) improved SCG’s product stability and quality, minimized variations, and enabled enhanced transition strategies.

Case Study

Westlake Chemical Improves Reaction Time from Hours to Minutes

Learn how Westlake assesses time sensitive supply chain opportunities, such as accepting a modified customer order, in a matter of minutes using Aspen Plant Scheduler rather than four hours using previous spreadsheet methods.

Case Study

Major European Chemical Producer Implements Planning and Scheduling Software for Elastomers and Styrenics

Learn how a major European chemical producer implemented aspenONE® Supply Chain Management, integrated to their SAP ERP system, and was able to reduce inventories by 20%, achieve 97% on time deliveries, and reduce the number of campaign transitions by 20%.

Case Study

创新快车道:节约新产品开发的时间和成本

了解凯诺斯公司如何借助Aspen Plus®间歇模拟,获得关于流程的宝贵见解,从而减少工厂试验和实验,保证流程响应不断变化的客户需求。

Case Study

イノベーションファストトラック:新製品開発における時間と コストの節約 (日本語事例カタログ)

ケノス社がAspen Plus®バッチモデリングを活用し、プロセスにおいてどのように利益を確保し、試運転、試作をほとんど行わず、顧客ニーズの変更に対応できたかをご説明しています。日本語の事例カタログです。

Case Study

Shell Adopts Global Supply Chain Process to Increase Profitability and Drive an “Enterprise First” Strategy

After the company identified uncommon operating procedures at each of its many refineries — which led to inefficiencies and lower margins — Shell launched “Enterprise First,” an initiative designed to standardize processes and technology across the organization. The key to driving this strategy — and meeting its objectives — is an integrated aspenONE® Supply Chain Management solution that helps Shell optimize refinery production, reduce costs and increase margin.

Case Study

혁신을 위한 패스트 트랙: 신제품 개발 시간 및 비용 절감

Qenos 사가 Aspen Plus®의 회분식 모델링을 어떻게 자사의 공정에 적용하여 변화하는 고객의 요구에 맞춰 플랜트 검증 단계를 최소화하고, 고객 맞춤형 제품을 신속하게 시장에 공급할 수 있었는지 실제 사례를 소개합니다.

Page 1 of 2