Case Study

Mid-Size EPC Reduces Cost Estimating Time Up to 90% to Meet Tighter Schedules and Budgets

Learn how S&B reduces estimating man-hours by between 50-80% depending on project stage through use of ACCE on all bids and estimates.

Case Study

Increasing Capacity in Sulfur Production Using Sulsim Modeling

Siirtec Nigi increased their sulfur production from 50 to 90 tons per day using Aspen HYSYS Sulsim to simulate the case study and conduct a sensitivity analysis around their oxygen enrichment. The new process required minimal equipment changes and no additional downtime other than turnaround.

Case Study

Braskem Implements Aspen DMC3 to Deploy Controllers in Just Two Weeks and Immediately Accrues Benefits

Braskem is the largest petrochemical company in Latin America, the leading producer of polypropylene in the United States, and the eighth-largest resin producer worldwide. Braskem used Adaptive Process Control within Aspen DMC3 to deploy controllers in just two weeks to start accruing benefits immediately. The benefits included lowered energy usage by 20%, increased production rates and reduced process variability. Download this case study today to learn more about the benefits Braskem realized by using Aspen DMC3 and discover how to achieve these benefits at your organization.

Case Study

Leading Refiner Reduces Planning Run Times from Hours to Minutes and Finds Profitable Solutions

Learn how this world leader in refining reduced planning runtime from 30 hours to 90 minutes, making the process 95% faster and allowing them to respond to market changes much faster.

Case Study

Optimización de la producción en transporte e instalaciones de producción de gas natural con una solución integral de ingeniería

Aprenda cómo YPFB Andina aumentó su producción de gas utilizando una solución de modelo integrado que proporcionó un aumento en las ganancias por $ 280 millones en 1 año.

Case Study

Cabot Streamlines and Standardizes Scheduling, Greatly Improving Visibility

Learn how specialty chemical manufacturer’s Carbon Black business implements Aspen Plant Scheduler at more than 20 plants worldwide to close the gap between planning and execution.

Case Study

LG Chem Significantly Increases Plant Capacity and Reduces Energy Usage

LG Chem increases capacity by 15% and saves energy through heat integration using Aspen Plus®, Aspen Energy Analyzer, and Aspen Exchanger Design and Rating

Case Study

Case Study: Chevron Employs APC Best Practices to Get Controllers Online Faster After Unit Turnarounds

Discover how Chevron overcame the challenge of rapidly returning APC controllers to service after unit turnarounds. Using aspenONE APC applications, Chevron reduced the effort required to maintain controller models. In addition to this, Chevron saved thousands of dollars for each day the controller would have been offline.

Case Study

Production Optimization of Natural Gas Pipelines & Field Production Facilities Using Performance Engineering

Learn how YPFB Andina was able to increase their gas production using an integrated model solution that was able to provide a $280M increase in revenue in 1 year.

Case Study

Lubrizol社Aspen Plus®活用事例 プロセス開発時間の短縮

Lubrizol社がどのようにAspen Plus を活用し、包括的にプロセス開発を行い、短期市場投入を実現しているか事例をご紹介します。

Page 2 of 194