Case Study

Hitachi Zosen Case Study

ACM is extremely powerful in reducing engineering time by up to 30% for new and novel processes.

Case Study

Global Oil Producer Leverages Real-World Models to Help Deploy Offshore Control System in Record Time

See how Genesis Consulting reduced “time to first oil” by two weeks, saving $3 million. This was accomplished through HYSYS and HYSYS dynamics models integrated with an FPSO's DCS control systems, for remote DCS testing and checkout.

Case Study

From Reactive to Proactive: Machine Learning Drives Better Business Outcomes

A specialty plastics plant needed a solution to reduce downtime on a problematic hypercompressor in their LDPE production process.

Case Study

Fluor Achieves Significant Time Savings in SRU Simulation

Learn how Fluor created a digital twin of their entire sulfur recovery unit, including recycle streams, in a single file using Aspen HYSYS® with Sulsim. Read this case study to find out how AspenTech’s solution for SRU optimization allows users to increase production, reduce OPEX and meet emissions regulations by modeling the complexities of the SRU and the full gas plant.

Case Study

European Refinery Tackles Heat Exchange Issues and Saves Millions in the Process

Learn how a European refinery saved $4 MM per year by implementing an automated fouling monitoring application utilizing Aspen HYSYS, Aspen EDR and MS Excel.

Case Study

European Engineering Company Saves $400,000 USD on CAPEX Using Performance Engineering

Discover how PETROLTERV saved significant CAPEX on a revamp project due to greater design accuracy enabled by the integrated aspenONE Engineering suite of products. Due to efficiencies gained from using this integrated software suite, PETROLTERV no longer needed to outsource a large number of engineering projects, such as air cooler design, pressure safety valve sizing and more. By increasing their ability to complete more projects in-house, PETROLTERV has reduced project costs, as well as delivered those projects on time and on budget.

Case Study

Global Supermajor Deploys Aspen PIMS-AO™ Globally

This case study details the methodical approach a global supermajor took, utilizing best-in-class technology, to improve production planning in global refineries and chemical plants with Aspen PIMS-AO technology. Based on side-by-side testing of different technologies, Aspen PIMS-AO led to new insights, increased confidence in results and enhanced conversations with traders.

Case Study

Optimización de la producción en transporte e instalaciones de producción de gas natural con una solución integral de ingeniería

Aprenda cómo YPFB Andina aumentó su producción de gas utilizando una solución de modelo integrado que proporcionó un aumento en las ganancias por $ 280 millones en 1 año.

Case Study

Detección de fugas en el rehervidor con meses de anticipación

Descubra cómo un fabricante de termoplásticos de ingeniería descubrió la causa raíz de fallas recurrentes en sus calderas de tubos y calderas utilizando el mantenimiento prescriptivo de Aspen Mtell.

Case Study

Data-Driven Maintenance Planning Saves $1.8 Million USD Per Year in Shutdown Costs

A global provider of knowledge-based maintenance, modifications and asset integrity services wanted to take a more data-driven approach to planned maintenance and reduce unplanned downtime to optimize lifecycle costs.

Page 146 of 194