Blog

The Evolution of Performance Engineering

Leading organizations are connecting process engineering simulations to plant data, creating a “digital twin” model that can calibrate autonomously and continuously.

Video

Refinery Planning & Scheduling

AspenTech expert, Senior Director of Product Management, Zafar Ali, shares his views on best practices in Petroleum Supply Chain, highlighting planning and scheduling.

Case Study

Global Oil Producer Leverages Real-World Models to Help Deploy Offshore Control System in Record Time

See how Genesis Consulting reduced “time to first oil” by two weeks, saving $3 million. This was accomplished through HYSYS and HYSYS dynamics models integrated with an FPSO's DCS control systems, for remote DCS testing and checkout.

Case Study

S&B Engineers Case Study

Learn how S&B reduces estimating manhours by between 50-80% depending on project stage through use of ACCE on all bids and estimates.

Executive Brief

Executive Brief: 5 Best Practices in Capital Project Estimating for the Process Industries

Engineering, Procurement and Construction firms (EPCs) are facing the challenge of fewer and smaller projects out for bid, and win rates are critical for their future success. This executive brief provides the winning combination of industry best practices and software that will allow you to create accurate bids, reduce risk and be more responsive to the changing needs of your customers.

Interactive Infographic

Complete the picture with Aspen HYSYS®

From oil and gas production to refining, gas treatment and liquefaction, Aspen HYSYS streamlines engineering and provides valuable insights to save organizations CAPEX, OPEX and engineering time. View this infographic and learn how companies have benefited from the newest innovations in Aspen HYSYS.

Blog

Two Ways to Reduce CAPEX and Support Safety and Sustainability Imperatives

Achieve new levels of automation with Aspen OptiPlant 3D Layout! Cut optioneering time in half to identify the best designs faster and reach up to 30% savings on capital expenditures.

Video

Concurrent Conceptual Engineering - Application Overview

Choosing options and alternatives rapidly and agilely (sometimes called optioneering), empowers engineers to reduce CAPEX when performing conceptual engineering design work. aspenONE Engineering delivers the solution through the only “activated” engineering workflow that seamlessly integrates all design, safety, energy  and project cost estimate functions, concurrently, delivering a lower CAPEX project, sooner. Watch this video to learn more

Video

Project Cost Estimation- Application Overview

Owner operator’s seek to understand the sources of cost from a bid received from an engineering and construction firm to remove unnecessary CAPEX and improve the design, benefiting both parties. A shared model based platform improves transparency, improves design and lowers CAPEX. Watch now to learn more.

Page 143 of 194