Professional Services

Accelerate time to value by leveraging comprehensive on-site and remote services to deploy industry-leading technologies faster and more efficiently than ever before.

Case Study

How Braskem Idesa Increased Reactor Uptime by Over 20% Using Existing Data and Resources

In this case study, learn how Braskem Idesa used Aspen ProMV™ to proactively identify and correct for conditions that historically led to high reactor fouling.

Case Study

Increasing Capacity in Sulfur Production Using Sulsim Modeling

Siirtec Nigi increased their sulfur production from 50 to 90 tons per day using Aspen HYSYS Sulsim to simulate the case study and conduct a sensitivity analysis around their oxygen enrichment. The new process required minimal equipment changes and no additional downtime other than turnaround.

Case Study

Braskem Implements Aspen DMC3 to Deploy Controllers in Just Two Weeks and Immediately Accrues Benefits

Braskem is the largest petrochemical company in Latin America, the leading producer of polypropylene in the United States, and the eighth-largest resin producer worldwide. Braskem used Adaptive Process Control within Aspen DMC3 to deploy controllers in just two weeks to start accruing benefits immediately. The benefits included lowered energy usage by 20%, increased production rates and reduced process variability. Download this case study today to learn more about the benefits Braskem realized by using Aspen DMC3 and discover how to achieve these benefits at your organization.

Case Study

Leading Refiner Reduces Planning Run Times from Hours to Minutes and Finds Profitable Solutions

Learn how this world leader in refining reduced planning runtime from 30 hours to 90 minutes, making the process 95% faster and allowing them to respond to market changes much faster.

Case Study

LG Chem Significantly Increases Plant Capacity and Reduces Energy Usage

LG Chem increases capacity by 15% and saves energy through heat integration using Aspen Plus®, Aspen Energy Analyzer, and Aspen Exchanger Design and Rating

Case Study

Case Study: Chevron Employs APC Best Practices to Get Controllers Online Faster After Unit Turnarounds

Discover how Chevron overcame the challenge of rapidly returning APC controllers to service after unit turnarounds. Using aspenONE APC applications, Chevron reduced the effort required to maintain controller models. In addition to this, Chevron saved thousands of dollars for each day the controller would have been offline.

Case Study

Control Column Performance Using Aspen HYSYS®

Learn how Tupras used the column analysis capability in Aspen HYSYS and its integration with Aspen Exchanger Design & Rating to significantly increase the column capacity and meet the required product specifications.

Case Study

Controle el desempeño de columnas con un Digital Twin de planta usando Aspen HYSYS®

Conozca cómo Tupras utilizó el análisis de columnas en Aspen HYSYS en conjunto con Aspen Exchanger Design & Rating para incrementar en un 40% la capacidad de columna y al mismo tiempo cumplir con las especificaciones de calidad del producto.

Case Study

规范性维护软件帮助Saras 提升经营绩效并推动卓越运营

Saras拥有地中海最复杂的炼油厂,每天的炼油产能为30万桶。作为数字化项目的一部分,他们正在评估如何提高资本和资产密集型炼油厂运营的可靠性。他们选择了AspenMtell,基于一个竞争性试点项目选择过程,最初的重点集中在关键炼油设备上,比如大型压缩机和水泵。 Aspen Mtell通过挖掘历史和实时操作以及维护数据来发现资产性能下降和故障发生之前的精确特征,预测未来故障并制定详细的行动以缓解或解决问题。

Page 1 of 63