Case Study

Global Pulp and Paper Company Improves Production, Cuts Maintenance Costs

A global pulp and paper manufacturer set out to predict risk and improve capacity using the power of automation.

Case Study

Multivariate Statistical Analysis Finds the Bad Actors in Light Component Losses

This petrochemical company launched an Aspen ProMV™ pilot project to investigate light component losses that go to the bottom of a fractionation column and pressurize the downstream column. Using Aspen ProMV for continuous processes, a model was developed, and bad actors that are highly correlated to the light product loss were identified. Aspen ProMV’s optimization tool was also utilized to provide better operating conditions to reduce losses.

Case Study

Leading Pulp and Paper Manufacturer Detects and Avoids Major Fire with Aspen Mtell

Aspen Mtell provided a nine-day advance warning of imminent kiln overheating, allowing the plant to change operating conditions and avoid an operational shutdown. Download this case study to learn more.

Page 1 of 1