Blog

Aspen AIoT Hub Recognized with 2021 Artificial Intelligence Award

The Aspen AIoT Hub has earned a 2021 AI Award from the Business Intelligence Group! The award recognizes our powerful Industrial AI solution.

Blog

Two Ways to Reduce CAPEX and Support Safety and Sustainability Imperatives

Achieve new levels of automation with Aspen OptiPlant 3D Layout! Cut optioneering time in half to identify the best designs faster and reach up to 30% savings on capital expenditures.

Blog

The Evolution of Performance Engineering

Leading organizations are connecting process engineering simulations to plant data, creating a “digital twin” model that can calibrate autonomously and continuously.

Blog

The Digital Organization of the Future Requires New Capabilities

Advances in technology are driving new levels of value creation — but your people still have to have the right skills in order to get the most out of digital solutions.

Blog

Breakthroughs in the 5th D: Capital Costing

This blog presents Aspen Economics as the next evolution in managing projects with cost as the fifth dimension (3D + time + cost) to improve on time, on budget projects with higher quality designs. Positions AspenTech as an innovator.

Blog

Process Data Management: As Exciting as Doing the Laundry

The process industry’s big data problem is the need to support the interlocked decisions that drive profitability.  Links to short video on data management for Manufacturing Operations Management (MOM).

Blog

Rise of Modular Design

Learn about the project CAPEX benefits of modular design. aspenONE Engineering has differentiated functionality for templating modular designs.

Blog

The Rise of Agile Cost Management

Think about estimating as a new way for business success for an E&C.

Blog

Integrating Batch Processing in a Continuous Processing Culture

The infrastructure supporting manufacturing operations in bulk chemicals has become pretty robust. The plants tend to be well instrumented and monitored. Sure, there are improvements to be made but when you compare the infrastructure prevalent in continuous plants with that of batch plants, you might find a pretty substantial gap.

Blog

A Dynamic Model: The Essential Accompanyist to the Project Conductor

The value of dynamic modeling across the asset creation lifecycle.

Page 1 of 2