Case Study

Perstorp Develops KPI Production Portal to Focus Organization on Meeting Plant Production Targets

Large Specialty Chemical Company develops advanced KPI production partial portal tool using Aspen InfoPlus.21 tools, building upon their extensive Aspen InfoPlus.21 installation.

News Article

Empowering people and optimizing production

Empowering people and optimizing production

Case Study

Oxiteno Plant Operations Reacts Quickly to Market Demand

Oxiteno has used the aspenONE® Engineering suite extensively over the past 25 years to modify and optimize current units, as well as design new units with complex configurations. Learn more.

News Article

AspenTech - A research effort that transformed the global energy sector

AspenTech - A research effort that transformed the global energy sector

Case Study

Next Generation of APC Delivers Benefits for Ethylene Manufacturer

Learn how Qenos, an Austrailian ethylene manufacturer, used Aspen DMC3 to revamp a demethaniser controller with very limited resources and achieved a 5-10% increase in cold end throughput, a 40% reduction in variability in overhead methane, and a 20% reduction in tower dP.

News Article

Training is the key

Oil and Gas News - Training is the key

Case Study

Multivariate Statistical Analysis Finds the Bad Actors in Light Component Losses

This petrochemical company launched an Aspen ProMV™ pilot project to investigate light component losses that go to the bottom of a fractionation column and pressurize the downstream column. Using Aspen ProMV for continuous processes, a model was developed, and bad actors that are highly correlated to the light product loss were identified. Aspen ProMV’s optimization tool was also utilized to provide better operating conditions to reduce losses.

News Article

Managing crude through automated scheduling

Managing crude through automated scheduling

Case Study

Mid-Size EPC Reduces Cost Estimating Time Up to 90% to Meet Tighter Schedules and Budgets

Learn how S&B reduces estimating man-hours by between 50-80% depending on project stage through use of ACCE on all bids and estimates.

News Article

Appetite for LNG grows, Industry Struggles

Appetite for LNG grows, Industry Struggles

Page 132 of 194