Case Study

LG Chem Significantly Increases Plant Capacity and Reduces Energy Usage

LG Chem increases capacity by 15% and saves energy through heat integration using Aspen Plus®, Aspen Energy Analyzer, and Aspen Exchanger Design and Rating

Case Study

Case Study: Chevron Employs APC Best Practices to Get Controllers Online Faster After Unit Turnarounds

Discover how Chevron overcame the challenge of rapidly returning APC controllers to service after unit turnarounds. Using aspenONE APC applications, Chevron reduced the effort required to maintain controller models. In addition to this, Chevron saved thousands of dollars for each day the controller would have been offline.

Case Study

Production Optimization of Natural Gas Pipelines & Field Production Facilities Using Performance Engineering

Learn how YPFB Andina was able to increase their gas production using an integrated model solution that was able to provide a $280M increase in revenue in 1 year.

Case Study

Lubrizol社Aspen Plus®活用事例 プロセス開発時間の短縮

Lubrizol社がどのようにAspen Plus を活用し、包括的にプロセス開発を行い、短期市場投入を実現しているか事例をご紹介します。

Case Study

Petrochemical Production Facility Drives Value and Maximizes Return with Non-linear APC

Non-linear Advanced Process Control (APC) improved SCG’s product stability and quality, minimized variations, and enabled enhanced transition strategies.

Case Study

Major European Chemical Producer Implements Planning and Scheduling Software for Elastomers and Styrenics

Learn how a major European chemical producer implemented aspenONE® Supply Chain Management, integrated to their SAP ERP system, and was able to reduce inventories by 20%, achieve 97% on time deliveries, and reduce the number of campaign transitions by 20%.

Case Study

Control Column Performance Using Aspen HYSYS®

Learn how Tupras used the column analysis capability in Aspen HYSYS and its integration with Aspen Exchanger Design & Rating to significantly increase the column capacity and meet the required product specifications.

Case Study

Petrofac Improves Process Design Accuracy by Debottlenecking Gas Processes Increasing Capacity by 20%

Download this case study to learn how Petrofac used Aspen HYSYS with Activated EDR models to optimize heat exchanger selection and configuration for a gas production client. This solution achieved the client's goal by increasing gas field production 20%, and as a bonus, reduced CAPEX 25%.

Case Study

Controle el desempeño de columnas con un Digital Twin de planta usando Aspen HYSYS®

Conozca cómo Tupras utilizó el análisis de columnas en Aspen HYSYS en conjunto con Aspen Exchanger Design & Rating para incrementar en un 40% la capacidad de columna y al mismo tiempo cumplir con las especificaciones de calidad del producto.

Case Study

Mine Moves from Calendar-based to Prescriptive Maintenance with Aspen Mtell

When one of the world’s largest fully integrated zinc and lead smelting and refining complexes wanted to improve their metallurgical operations, the company turned to Aspen Mtell® prescriptive maintenance.

Page 157 of 194