Video

Polymers Scheduling with Aspen Plant Scheduler

With polymers scheduling utilizing Aspen Plant Scheduler, companies can improve throughput and reduce the number of transitions while simultaneously achieving high on-time order fulfillment rates. Polymer manufacturers are looking for ways to increase on time order fulfillment, unlock their plants “hidden capacity," and reduce total time spent in transitions. Scheduling with intuitive product wheels and powerful sequence optimization methods assists in achieving these goals.

Video

Activated EDR in Aspen HYSYS

Learn how to save on energy, CAPEX and OPEX by improving the fidelity of your process simulation flowsheets using rigorous heat exchanger models. Now it is easier than ever to generate rigorous heat exchanger models from Aspen HYSYS using the Activated Exchanger Design & Rating capability.

Video

Performance Management

Improve operational performance with real-time visualization to increase visibility, agility and responsive to production problems with performance management.

Video

Part 4: Optimizing Heat Exchanger Design

Part 4: This interview with Hafez Bharami, a PhD chemical engineering in our heat exchanger R&D team.

Video

Part 2: Optimizing Heat Exchanger Design

Part 2: Technical direction and vision. This interview with key developer Gabe Aurieoles, puts the face to the technical expertise and vision behind the EDR product.

Video

Part 1: Optimizing Heat Exchanger Design & Operation

Part 1: Improving the User Experience -  This interview with AspenTech developer Sam Neilsen, is a compelling piece to put the people behind the software with EDR.

Video

Achieving Capital Project Efficiency

With rising capital cost overruns and more projects falling behind schedule, EPCs need an estimating system that enables them to bid on projects precisely and efficiently. Hear Ron Beck, Director of Industry Marketing at AspenTech, describe the unique benefits of Aspen Capital Cost Estimator compared to traditional estimating approaches.

Video

Achieving Capital Project Efficiency

With rising capital cost overruns and more projects falling behind schedule, EPCs need an estimating system that enables them to bid on projects precisely and efficiently. Hear Ron Beck, Director of Industry Marketing at AspenTech, describe the unique benefits of Aspen Capital Cost Estimator compared to traditional estimating approaches.

Video

Aspen Hybrid Models™のご紹介 (日本語字幕つき)

第一原理モデルと、業界専門知識を備えた機械学習とを組み合わせたAspen Hybrid Modelsは、今日のプロセスエンジニアのサポート役としてインダストリアルAIの活用を広く大衆化します。 このビデオでは、Aspen Hybrid Modelsの概要をご紹介します。

Video

Aspen Fidelis Reliability: Empowering Confident Decision-Making

See how Aspen Fidelis Reliability enables any engineer in any department to identify the cause of lost operational availability and justify important decisions.

Page 20 of 194