How ExxonMobil Uses Aspen DMC3 Builder to Capture More APC Benefits
Leading companies rely on a powerful integrated platform to manage the entire lifecycle of their Advanced Process Control (APC) applications. Download this on-demand webinar and learn how ExxonMobil used key Aspen DMC3 Builder capabilities to improve APC performance, increase production and reduce energy consumption.
Aspen DMC3 Robust Control
Demo showing a controller before and after Robust Control. Turning on Robust Control stabilizes a controller for a temporary period until the model can be updated to reflect true plant behavior.
Case Study: Chevron Employs APC Best Practices to Get Controllers Online Faster After Unit Turnarounds
Discover how Chevron overcame the challenge of rapidly returning APC controllers to service after unit turnarounds. Using aspenONE APC applications, Chevron reduced the effort required to maintain controller models. In addition to this, Chevron saved thousands of dollars for each day the controller would have been offline.
Vertical Integration
Reduce batch cycle time, production errors, and operating costs
Dehydration Process Optimization
Prevent quality issues that limit dehydration operations and cost additional solvent and energy input using the latest in water-gas-glycol modeling.
Dehydration Process Optimization - Application Overview
Dehydration process optimization is useful for Minimizing Solvent Costs and Meet Gas Specifications to avoid issues in downstream equipment and product sale. With Aspen HYSYS, you have dehydration simulation powered with Cubic Plus Association or CPA for unparalleled accuracy. Watch this video to learn more.
Podcast Series - Front-End Engineering Design: Why is it so crucial to project success?
Hydrocarbon Processing editor-in-chief and associate publisher, Lee Nichols, spoke with Paul Donnelly, Industry Marketing Director, Aspentech, on the importance of FEED and critical steps and technologies that can help optimize capital projects.
Enabling Better Project Outcomes: Six Tips for Faster, More Accurate Cost Estimates
Six tips are offered that speak to the strengths of ACCE: Eliminated manual tasks, automates repeated tasks, handles change management, leverages historical content and starts the estimating process leveraging conceptual engineering.
Strategic Estimating Systems (SES)
Learn how SES, one of the leading estimating organizations worldwide, saves 70% manhours using ACCE. SES is responsible for, estimating projects such as SADARA, Suncor Tar Sands, and Mozambique LNG using ACCE.
Bidding & Cost Estimation - Application Overview
When project managers and estimators eliminate bidding and estimating sources of risk, they are empowered to produce optimized bids and estimates faster with less errors, resulting in lower CAPEX bids and estimates. Aspen Capital Cost Estimator is an integrated model-based estimating system delivering the power to minimize estimating risk, develop bids faster with improved consistency and accuracy. Watch now to learn more
Thursday, April 2, 2026
Tuesday, April 14, 2026
Wednesday, April 15, 2026
Thursday, April 16, 2026